Haulage Capacity and Rate Intelligence
A standard rate is only valid under standard conditions. SuggiForesite recognises when a quote falls outside those conditions, forecasts the true cost of fulfilling the work, and flags it for review before the quote goes out.
Connected carrier network · Demonstration data
Haulage Capacity and Rate Intelligence
Available supply, not fleet size. Illustrative carrier profiles for one compatible route and vehicle class. Booking notice and contractual price exposure are separate risks.
Planning horizons only. Longer horizons require fresh quotes and confirmation, not extrapolated guarantees.
Required
1,800 t/day
Planning assumption
Confirmed allocation
960 t/day
Subject to current illustrative quote validity
Capacity gap
840 t/day
Uncovered demand is not costed as delivered
Blended quoted cost
$12/t
Synthetic carrier rates · covered tonnage only
Carrier capacity and rate profiles
| Carrier | Maximum / available trucks | Confirmation | Compatible | Rate + charges · AUD/t | Mobilisation | Validity / review |
|---|---|---|---|---|---|---|
| Carrier A | Maximum 20 | + $1 charges · synthetic | 28 days Booking deadline passed by 14 days | 45 / 28 days Illustrative quote valid · Proposed $12/t at review | ||
| Carrier B | Maximum 12 | + $1 charges · synthetic | 14 days Request in 0 days | 60 / 42 days Illustrative quote valid · Future rate unknown | ||
| Carrier C | Maximum 10 | + $2 charges · synthetic | 7 days Request in 7 days | 30 / 21 days Illustrative quote valid · Proposed $16/t at review |
Preferred carrier unavailable
Without Carrier A: 448 t/day covered; 1,352 t/day unfilled.
Alternative blended cost: $14/t. Uncovered tonnes require a current compatible quote.
Manager review queue
- Confirm actual trips, payload, dates and carrier acceptance.
- Seek capacity for 840 uncovered tonnes per day.
- No contractual review within the selected illustrative window.
- Validate fuel levy, waiting, overtime, minimum charges and accepted rate notices before commitment.
Each truck assumes 32 tonnes and two completed trips per day. Profiles are fictional. Rate history, dispatch acceptance, delivered versus offered loads, invoices and declined requests are not connected. No market pressure uplift is invented. Short booking notice prompts review; it does not silently cancel confirmed capacity.
The gap
40,000 tonnes is not enough information
A customer requests 40,000 tonnes for a major project with a short delivery window, a long haul distance or a requirement for additional trucks. Applying the standard rate could make the quote uncompetitive, underestimate the cost or destroy the expected margin.
The same total volume can move the economics in either direction. Large, predictable volumes can lower the cost per tonne through efficient scheduling and reduced empty running. A compressed window can raise it sharply through overtime, subcontractors and surge capacity. The rate must be modelled as a function of the job, not read off a card.
Same job, two economics
The delivery window changes everything
Scenario A · Planned
40,000 t over 40 days
1,000 t/day · about 16 trucks
Existing fleet copes, return loads can be coordinated, no surge capacity required.
Scenario B · Compressed
40,000 t over 10 days
4,000 t/day · about 63 trucks
Four times the daily capacity. Subcontractors, additional shifts or a renegotiated window.
Illustration only. Assumes a 32 tonne payload and two completed loads per truck per day with no downtime. Actual capacity must be calculated from route cycle times, working hours, loading and unloading, fleet availability and applicable operating requirements.
Try it
RFQ assessment
Total tonnage
40,000 t
Delivery window
10 days
Payload per truck
32 t
Loads per truck per day
2
Trucks available for this job
20
Assessment
Review requiredRequired intensity
4,000t/day
Trucks required
63of 20 available
Fleet utilisation
315%
Illustrative cost curve · unit cost vs delivery intensity
Conceptual only. The curve shape must be learned from real data or built from a validated cost model, never assumed.
Three figures, not one rate
Expected operating cost
$10.00/t
Capacity adjusted cost
$25.00/t
Recommended quote range
$23.00 to $28.00/t
Illustrative figures against a $10/t standard rate. A revised rate cannot responsibly be calculated without route, cost and capacity data. The recommended range supports a commercial decision; it is never submitted automatically and never pretends to know the market clearing price.
Why the rate needs review
The required delivery intensity exceeds available fleet capacity. Additional trucks, overtime or subcontracted haulage could materially change the cost per tonne.
- · Confirm available trucks and actual trip cycle times.
- · Calculate incremental fleet and subcontractor costs.
- · Check backhaul opportunities and expected waiting time.
- · Recalculate expected cost per tonne and contribution margin.
- · Obtain commercial approval before submitting the quote.
How the platform forecasts the correct rate
Read the request
Ingest the RFQ: material, tonnage, delivery location, start date, daily volumes, delivery window and service requirements.
Test the standard rate
Check whether the request falls within the rate's approved conditions: route, vehicle, material, volume range, delivery intensity, fuel assumptions and contract period.
Calculate the delivery requirement
Estimate loads, vehicle cycles, truck days and required daily capacity. Compare these with available fleet, existing commitments and realistic operating productivity.
Recalculate the economics
Use actual cost records and appropriate rate assumptions to estimate fuel, driver time, vehicle costs, empty running, tolls, waiting, additional capacity and subcontractor premiums.
Flag, explain and request approval
If the standard rate is no longer appropriate, show the cost drivers, estimated range, assumptions, margin exposure and options for a person to review. Nothing is requoted automatically.
The learning loop
Estimate, quote, deliver, compare, recalibrate
For each completed job, the original quote assumptions are connected to what actually happened. This exposes which routes, delivery windows, customers and volume bands consistently cause the standard rate to understate costs.
- · Tonnes delivered and delivery dates
- · Trucks and driver hours used
- · Loaded and empty kilometres
- · Fuel, maintenance and subcontractor costs
- · Loading, unloading and waiting time
- · Rate charged, surcharges recovered and actual contribution
- · Delays, failed deliveries and other exceptions
What it informs
One model, six commercial decisions
Resource pricing
Quotes reflect the true cost of servicing the volume, not a rate card built for ordinary conditions.
Haulage capacity
Fleet gaps are visible weeks out, while subcontractors or additional shifts can still be arranged on reasonable terms.
Staffing
Driver hours, overtime and shift requirements are estimated from the delivery profile, not discovered on the day.
Supply
Tonnage commitments are matched to production capacity before the promise is made to the customer.
Market values
Capacity constrained periods become visible, so the business knows when demand gives it pricing room.
Margin protection
The jobs most likely to destroy margin at the standard rate are flagged before the quote is submitted.
Part of the core, not a calculator. The project demand model tells the business how much material may be needed, where and when. The haulage cost model tells it what that demand may cost to service under real operating constraints. The commercial model then helps management decide whether and how to pursue the work. That is how SuggiForesite flags when a seemingly ordinary quote represents an extraordinary logistical commitment.